Volume 9 Issue 5 ISSN 1923-7162 |
Welcome to Dave's Shop Talk's Home Improvement Newsletter of questions from our members on their construction projects, a Tip of the Month and a home remodeling article, both from our website at https://daveosborne.com.
May was a busy month for me, personally. I spent a lot of time on top of my roof, power spraying the moss and algae off of it. One corner was particularly bad, caused from overhanging fir trees. It was also the highest point of the roof, about 30 feet to the ground. I invested in a 3 point harness to wear, tied to a bracket on the ridge. I recommend, strongly, this type of safety harness. In fact it is required now in British Columbia by Workers Compensation rules.
I bit the bullet and hired a professional faller to remove those three trees, causing me so much grief all these years. They not only created shade for moss to propagate, but also filled the gutters with needles and cones.
Some of you may cringe when you hear of a power sprayer on a roof. Yes, you need to be careful. My electric sprayer is only 1500 psi, I hold the nozzle back a bit and fan it out. It does a great job. I start at the ridge and work my way to the eaves, never spraying up to lift the asphalt shingles. Always use the least amount of pressure that is necessary to remove the moss. Try to get it all, so it won't relocate in the Fall.
In my opinion, based on the building code, we build the foundation for a house below the frost line. At this time we also include the footings for posts which support roofs, decks, floors, etc. The footings for these posts are set below the frost line and concrete posts extend up to about 8" above grade. Usually, the preferred size of post is the 6x6, even for decks. Then, as you say, the porch slab and concrete stairs are poured in place after the backfill is compacted in place. In a retrofit or renovation, we do the same thing. We excavate for the footings, usually square pads with concrete posts, 8" above grade with a steel post saddle on top. Erect our posts beams and roof, then fill and compact the area for the slab and pour it under the roof. If you live in an area, not influenced by frost, you still need to build a footing or pad to support the weight of the roof structure. This footing or pad should be below the slab for aesthetic reasons and have a short concrete base so the wooden post is not sitting in water.
If you pour the slab first and then put your posts on top, make sure you allow a thicker slab under the post to support the roof. There is nothing wrong with this. A post saddle should be embedded into the slab at the time of pouring or drilled in later. The saddle not only holds the bottom of the post secure, it separates the wood from concrete. The concrete base for a typical post is usually about 2' square by 8" deep.
Dave
Yes, I think everyone's Dad had some weird and wonderful statement or saying. If there are stupid people out there, does that mean their questions are wise? Ha!
In my area gutters are not required by the building code, although, just about everyone installs them. If installed they have to be installed correctly - either run into the perimeter drain or run into a separate pipe, which leads to the ditch or storm sewer system or run onto the lawn through a splash guard. Different jurisdictions handle the codes according to their own amendments. In areas where there is severe freezing, gutters are a detriment. In Texas, they leave gutters off the house over their flower beds, so that they get the little rain that may fall.
The new houses built today usually have fascia gutters installed. This is a 5" gutter that goes directly on the rafter or truss fascia, eliminating a separate fascia board. Those 5" continuous fascia gutters coming right out of the truck are the best and the competition keeps the price fair. In building my own house these are the tasks that I assigned to the sub-trades: foundation coating - sprayed on from a truck; continuous gutters and downspouts; drywall install and mud, including textured ceilings; insulation and vapor barrier, not just the blown in; carpet and lino, I did the hardwood and ceramic tile; HVAC; rough-in plumbing - you don't want to make mistakes here.
Everything else I did myself - foundation, framing, including installing the windows and doors, finishing, cabinets and counter tops, electrical - under a homeowner permit, roofing, perimeter drain, etc., siding - while the contractors were drywalling, plumbing finish and trim, painting. I enjoyed doing most of the work myself. It took 10 months to get it done to the occupation permit, although I moved in months prior to actually getting official permission to move in. We moved in before the kitchen cabinets were built - my first priority.
Well, I've rambled enough. I better get the boat hooked up - heading out to set our crab traps and enjoy our good weather.
Later,
Dave
Hi Rick,
Thanks for the email.
Each joist is toe-nailed to where it crosses over the 6x6s, one nail on each side, of each intersection. The box joists are also toe-nailed into the 6x6s, from the outside, as well as to each joist.
Dave
Hi Mary,
We are real people here, alright.
You can checkout About Us without being a member and the latest newsletter, among others - videos, etc.: https://daveosborne.com/dave/index.php
Yes, I'm Canadian, but I still use the Imperial measure, although familiar with metric, as well.
We have a refund policy, if not satisfied, a full refund - up to 30 days, as long as you don't download a bunch of plans and articles. We can tell, or at least my webmaster brother, Dan, can.
Hope to hear from you, Mary,
Dave
Okay, thanks, Mary,
Dave
(Mary did join our site)
Hi Mike,
Your centers on the 3x6 rafters are too far apart. I would not go more than 2' centers to support the plywood. If you want to go with 4' centers on the rafters, you should install 2x4 purlins on edge on top of the rafters.
I would install the rafters over beams instead of between them. With under slung beams you are able to move the beams in a maximum of 2' cutting down the span on the rafters.
I would move the posts in from the ends of the beams, as well. This also cuts down the span of the beam, as well as leaving room for a brace on each side of each beam. Also a brace should be installed from the post to a rafter in the other direction.
Your beams should be a double 2x10x12' long.
Just a note: with cedar shakes you don't need solid ply sheathing, strapping is also acceptable. I understand if you want the plywood for aesthetic reasons.
Dave
Hi Doug,
Rafters actually are part of a unit, similar to trusses being a unit. Rafters need to have ceiling joists and ridge boards. Ceiling joists to tie the walls together to prevent them from bowing out under a load, similar to the bottom cord of a truss. Ridge boards to fasten the top of the rafters to and keep them straight. The bird's mouth is part of a rafter forming a notch for the wall to fit in helping the ceiling joist, which is nailed to it, to hold the wall in.
Roof joists are simply structural members forming a flat roof or roof slope as well as the ceiling.
Dave
(taken from our website: DaveOsborne.com
First of all, determine which direction you are going to install the hardwood floor boards. Conventionally the hardwood floor boards are run with the length of the room rather than across it. Another choice is installing the hardwood floor boards diagonally. Measure along a wall, the equivalent of one board plus the tongue, plus 1/4" for expansion. Go to the corners of the room and snap a line between these points. Don't follow the wall, follow the line. This first hardwood floor board should be laid down with its tongue...read more at https://daveosborne.com/dave/articles/how-install-hardwood-floor.php
Well, that does it for another month. We hope some of these questions and answers will help you with your renovation project. If you need more advice, join our website, then send me an email.
Be careful out there!
Hi, I'm Dave Osborne. With over 50 years experience as a journeyman carpenter, foreman and contractor in heavy construction I enjoyed working with apprentices and sharing the tricks of the trade that others shared with me. Now I get emails from Members all over the world and we include many of my answers in our Free Monthly Newsletters. Some of my answers include drawings and instructions specific to a project, but may also answer your questions. I use correct construction terminology, so you can confidently inform your building supply dealers or contractors exactly what you need.
ASK DAVE!
Membership gives you full access to our hundreds of how-to articles, woodworking plans, converters, calculators and tables. Our Stair Calculator is one of the most popular on the internet. We have projects you can build for (and with) your kids, furniture for your wife, and sheds and gazebos. If you run into a problem or need advice your Membership includes unlimited email questions to me through our Ask Dave quick response button.